Raw Sewage Flooding Prevented from Seven (7) Story Sanitary Sewer Stacks

A seven (7) story residential complex experienced several incidents of nasty flooding and raw sewage contamination due the corrosion cracking of four (4) sanitary drain stacks over only a couple of years. Revive Pipes installed Cured in Place Pipe (CIPP) structural liners in three (3) remaining sanitary sewer stacks saving the building and its tenants…

Details

Senior Care Facility Saved from Kitchen Shutdown Due to Catastrophic Sewer Main Failure

A senior care facility was on the verge of an emergency excavation to relieve a blockage causing backups in the facilities kitchen. The facility was literally within hours of a major excavation ten (10) feet below the floor inside of the facility that would have shut the kitchen down for a couple of weeks. Revive…

Details

Costly & Invasive Boiler Room Excavation & Sewer Pipe Replacement Averted

A large commercial building was experiencing sewer backups in their materials receiving bay and mechanical room. Revive Pipes saved the facility over $100,000 and the major disruption of having to dig twelve (12) feet deep under the concrete slab and hot water boiler in the boiler room to replace the sewer pipe. The sewer drain…

Details

Separated Floor Drain Pipes Allowing Water to Undermine Building Foundation

A school’s mechanical room had several floor drains that became separated from the P-Traps in the sewer drain line. Revive Pipes installed structural liners to span the gap in the floor drains and prevent water from flowing under the concrete slab floor and degrading the building foundation and bedding for the sewer drain pipe. The…

Details

Improperly Installed Roof Drains on a Skyscraper Cause Rainwater to Leak into a Law Office

One of Calgary’s tallest office towers had the flat, roof parapets replaced. After the parapets were replaced, water was discovered leaking into premium tenant spaces. Revive Pipes installed Cured in Place Pipe (CIPP) structural liners in all of the roof drains in the replaced roofs, stopping all of the water leaks into the tenant space.…

Details

Underground Contaminated Fluid Tank Leak Detection Line Repaired

A large power generation facility in Calgary, Alberta experienced leaks due to corrosion in the leak detection sample line for one of the underground contaminated fluid containment tanks that was below a twelve (12) inch thick structural concrete slab. Revive Pipes saved the facility over $50,000 when we removed tuberculation buildup and installed a Cured…

Details

Elevator Saved in Small Towns 1910 Historic Alberta Government Building

An Alberta government building was faced with having to close down its antique, manual elevator when a vitrified clay (VCP) sewer drain pipe that was partially embedded in the elevators foundation cracked. The high cost of the sewer pipe repair while keeping the elevator foundation intact was too much for the facility to justify keeping…

Details

Boiler Room Sewer Replacement Avoided

A large commercial building was experiencing sewer backups in their materials receiving bay and mechanical room. Revive Pipes saved the facility over $100,000 and the major disruption of having to dig twelve (12) feet deep under the concrete slab and hot water boiler in the boiler room to replace the sewer pipe. The sewer drain…

Details

Ground Shifting Causes PVC Wye Fitting to Break Next to the Foundation Inside of a School

A classroom in a school became a poor learning environment when nasty sewer gases began to permeate the room due to a broken fitting and offset joint below the floor. The pipe was prohibitively expensive to fix because of its location 4 feet below the floor next to the building foundation. Revive Pipes saved the…

Details

International Distillery Saves Millions

An international distiller’s blending room drains were completely eaten away and collapsed in many sections. The blending room housed 40 alcohol tanks that were 100,000 litres in size. The tanks are supported by a 12 inch thick structural slab throughout the blending room. During production, the blending room is a Class 1, Div 1 Explosive…