Costly & Invasive Boiler Room Excavation & Sewer Pipe Replacement Averted

A large commercial building was experiencing sewer backups in their materials receiving bay and mechanical room. Revive Pipes saved the facility over $100,000 and the major disruption of having to dig twelve (12) feet deep under the concrete slab and hot water boiler in the boiler room to replace the sewer pipe. The sewer drain…

Separated Floor Drain Pipes Allowing Water to Undermine Building Foundation

A school’s mechanical room had several floor drains that became separated from the P-Traps in the sewer drain line. Revive Pipes installed structural liners to span the gap in the floor drains and prevent water from flowing under the concrete slab floor and degrading the building foundation and bedding for the sewer drain pipe. The…