Senior Care Facility Saved from Kitchen Shutdown Due to Catastrophic Sewer Main Failure

A senior care facility was on the verge of an emergency excavation to relieve a blockage causing backups in the facilities kitchen. The facility was literally within hours of a major excavation ten (10) feet below the floor inside of the facility that would have shut the kitchen down for a couple of weeks. Revive…

Costly & Invasive Boiler Room Excavation & Sewer Pipe Replacement Averted

A large commercial building was experiencing sewer backups in their materials receiving bay and mechanical room. Revive Pipes saved the facility over $100,000 and the major disruption of having to dig twelve (12) feet deep under the concrete slab and hot water boiler in the boiler room to replace the sewer pipe. The sewer drain…

Underground Contaminated Fluid Tank Leak Detection Line Repaired

A large power generation facility in Calgary, Alberta experienced leaks due to corrosion in the leak detection sample line for one of the underground contaminated fluid containment tanks that was below a twelve (12) inch thick structural concrete slab. Revive Pipes saved the facility over $50,000 when we removed tuberculation buildup and installed a Cured…

Elevator Saved in Small Towns 1910 Historic Alberta Government Building

An Alberta government building was faced with having to close down its antique, manual elevator when a vitrified clay (VCP) sewer drain pipe that was partially embedded in the elevators foundation cracked. The high cost of the sewer pipe repair while keeping the elevator foundation intact was too much for the facility to justify keeping…

Boiler Room Sewer Replacement Avoided

A large commercial building was experiencing sewer backups in their materials receiving bay and mechanical room. Revive Pipes saved the facility over $100,000 and the major disruption of having to dig twelve (12) feet deep under the concrete slab and hot water boiler in the boiler room to replace the sewer pipe. The sewer drain…

International Distillery Saves Millions

An international distiller’s blending room drains were completely eaten away and collapsed in many sections. The blending room housed 40 alcohol tanks that were 100,000 litres in size. The tanks are supported by a 12 inch thick structural slab throughout the blending room. During production, the blending room is a Class 1, Div 1 Explosive…

Commercial Building Can’t Shut Down Sewer for Repair

A large commercial building in Calgary, Alberta had a hole in the asbestos concrete main sewer for the facility with significant roots growing through the hole and causing sewer backups in the facility. The facility was operational 24/7 and couldn’t shut down to properly repair the hole in the main sewer pipe. The traditional repair…