Costly & Invasive Boiler Room Excavation & Sewer Pipe Replacement Averted

A large commercial building was experiencing sewer backups in their materials receiving bay and mechanical room. Revive Pipes saved the facility over $100,000 and the major disruption of having to dig twelve (12) feet deep under the concrete slab and hot water boiler in the boiler room to replace the sewer pipe. The sewer drain…

Improperly Installed Roof Drains on a Skyscraper Cause Rainwater to Leak into a Law Office

One of Calgary’s tallest office towers had the flat, roof parapets replaced. After the parapets were replaced, water was discovered leaking into premium tenant spaces. Revive Pipes installed Cured in Place Pipe (CIPP) structural liners in all of the roof drains in the replaced roofs, stopping all of the water leaks into the tenant space.…

Underground Contaminated Fluid Tank Leak Detection Line Repaired

A large power generation facility in Calgary, Alberta experienced leaks due to corrosion in the leak detection sample line for one of the underground contaminated fluid containment tanks that was below a twelve (12) inch thick structural concrete slab. Revive Pipes saved the facility over $50,000 when we removed tuberculation buildup and installed a Cured…

Commercial Building Can’t Shut Down Sewer for Repair

A large commercial building in Calgary, Alberta had a hole in the asbestos concrete main sewer for the facility with significant roots growing through the hole and causing sewer backups in the facility. The facility was operational 24/7 and couldn’t shut down to properly repair the hole in the main sewer pipe. The traditional repair…

Robotic Cutter Grinds through Metal Brackets in Storm Sewer

A Calgary, Alberta high rise apartment building was experiencing backups in their storm sewer system. The storm sewer would back up and water would pour into the parkade under the building through cracks in the foundation wall. A prominent commercial drain cleaning company hydro flushed the eight (8) inch storm sewer and then performed a…

Regional School Office Saved From Shutdown

A regional school administration office in Alberta was having problems with their sewer system. Sewer blockages were frequently causing raw sewage to back up through floor drains in the washrooms. The cast iron, main sewer pipe in the facility was heavily corroded and ran underneath the main hallway in the facility for the entire length…