Senior Care Facility Saved from Kitchen Shutdown Due to Catastrophic Sewer Main Failure

A senior care facility was on the verge of an emergency excavation to relieve a blockage causing backups in the facilities kitchen. The facility was literally within hours of a major excavation ten (10) feet below the floor inside of the facility that would have shut the kitchen down for a couple of weeks. Revive…

Costly & Invasive Boiler Room Excavation & Sewer Pipe Replacement Averted

A large commercial building was experiencing sewer backups in their materials receiving bay and mechanical room. Revive Pipes saved the facility over $100,000 and the major disruption of having to dig twelve (12) feet deep under the concrete slab and hot water boiler in the boiler room to replace the sewer pipe. The sewer drain…