Regional School Office Saved From Shutdown
A regional school administration office in Alberta was having problems with their sewer system. Sewer blockages were frequently causing raw sewage to back up through floor drains in the washrooms. The cast iron, main sewer pipe in the facility was heavily corroded and ran underneath the main hallway in the facility for the entire length…